Ipso by Cherrystone
Sample

A Studio sketch of a synthetic distributor.

Meridian Distribution was sketched from a forty-minute conversation and one weekly report. Open its views, move the levers, change an assumption on the Evidence screen, and let the Method page check the arithmetic in your browser. The company and every figure are fictional.

Your own sketch takes about twenty minutes. A Studio session builds it with you from your own documents.

What you will find inside · four screenssynthetic
Every view prints its balance line; the levers re-derive the whole package.
01 Test the levers

Change an assumption; everything re-derives.

On the Evidence screen, replace an assumed number with one you believe, and every view, every finding and every balance line recomputes. The Method page re-runs the self-check: views render from parameters, balance lines reconcile within a thousandth, no currency appears in a view, every view has a live lever, no figure is stored.

Reconciles to zero

Under every view, recomputed each time the page opens.

Grades you can change

Record an observation and watch the grade and the figures move.

Capacity, not sales

Levers change ceilings and headroom; they do not promise an increase in output sold.

02 Sample sketches

The same question, in eleven industries.

Each sketch asks where work stalls and what limits output. Pick the one closest to your operation; "something else" is a neutral five-stage template.

Supply chain & logistics

Where orders stall and what limits in-full, on-time shipping.

Short-term insurance

Where claims stall and what limits first-time settlement.

Banking & lending

Where applications drop out and what limits loan payouts.

Telecommunications

Why business orders miss committed dates and what limits activations.

FMCG manufacturing

Where cases are lost between plan and truck and what limits output.

Mining & minerals

Where tonnes are lost between blast and ship and what limits shipments.

Agriculture & grain

Where produce shrinks, spoils or loses grade and what limits throughput.

Pharmaceutical cold chain

Where consignments break temperature limits and what limits in-range deliveries.

Solar generation

Where energy is lost between sunlight and meter and what limits yield.

Solar EPC delivery

Where signed projects stall before connection and what limits monthly handovers.

Aquaculture

Where mussels are lost between seed and pack and what limits packing. Kelpwater, an original sketch of a rope-grown mussel farm with its own factory, is open to read.

Something else

A general version of the same question, on a five-stage template.